There has been a great deal of progress made at this Quail Hollow pool renovation.  The deck pourover edge has been cut off and the demolition of the existing waterline tile and tile facing on the raised wall is now complete.

Matthews9

The new waterline tile and travertine remodel coping in Noce Select have been installed and are ready to be grouted.  The homeowner chose to reface the raised wall with ledger stone in Golden Sunrise.  The installation of this stone is almost complete.

Matthews7

Matthews4

A new concrete slab has been poured to accommodate the new pool equipment, which will be installed by the end of the week.  The pool will also be ready for Pebble Sheen application by the end of the week.