The steel erection phase of this project is now complete.  Pictured below are the skimmer and autofill.

Spath8

2 1/2″ plumbing was utilized for the main drain and 2″ plumbing for the skimmer & therapy jets

Spath10

The rough plumbing is also complete, including the plumbing for the in-floor cleaning system.

Spath15

 3\8″ rebar was tied 12″ on center in the floor & walls

Spath17

Spath20

 The next phase of this project is the shooting of the concrete shell, which will be scheduled as soon as the temperatures stay above freezing at night.