As construction on this new home is winding down, we have been back to work on this project and have completed the tile and coping phase.

Waterline tile is National Pool Tile in Siberia Ice 6×6

Lane58

 Travertine coping in Ivory Select, 12×24 on the pool and 16×24 on the spa

Lane61

The spa was faced with natural stone to match the house and pool cabana

Lane64

Lane65

Work has also begun on the travertine deck installation.  

Ivory Select in 16×24

Lane69

Lane73

 As work continues on the installation of the travertine deck, the pool is also being prepped for the installation of Blue Granite Pebble Sheen this week.

Now is a great time to build a pool!